Posts

Showing posts from October, 2018

PAEC (Pakistan Atomic Energy Commission) TEST SAMPLE A

Image
PAKISTAN ATOMIC ENERGY COMMISSION ENTRANCE TEST FOR POSTGRADUATE TRAINING SAMPLE       TEST A 1. Which number should come next?  1 5 17 37 ______            A) 63            B) 64            C) 65            D) 66            E) 67 2. Stationary point at curve y = x 2 is x =  __________________            A) 0            B) 1            C) 2            D) 2 x            E) Can’t be determined with the given data 3. Choose the lettered word or phrase that is the most nearly Opposite in meaning to the word in capital letters: ENDORSE:            A) provoke criticism            B) receive payment            C) submit unwillingly            D) oppose publicly            E) perform quickly 4. An elliptical field has its major axis equal to 10 km and minor axis equal to 8 km.  If some one is interested to place a rope around the field at a distance of 100 m  from the periphery of the ellipse, how long rope will he

Major Gas Fields of SNGPL in Pakistan

Image
Major Gas Fields of SNGPL in Pakistan 1. Khyber Pakhtunkhwa       Field                   Capacity MOL                  295  MMCFD MELA                 7     MMCFD NASHPA            99    MMCFD 2. Punjab Small Northern Source      47  MMCFD ADHI                                 68  MMCFD Salsabila Dhodak               12 MMCFD 3. Balochistan Pirkoh+Loti       24  MMCFD SUI                   265 MMCFD 4. Sindh Qadirpur (Processed+Raw+Permeate)    220+45+64  MMCFD Badar                                    17  MMCFD Hassan                                  11  MMCFD Mari Engro                            90  MMCFD Sawan+Tajjal+Latif               42  MMCFD RLNG                                 635  MMCFD Kandhkot + chchar               70  MMCFD zamzama                              42  MMCFD

SNGPL Test Sample

Image
Company Profile MCQs (SNGPL) What is MMCFD ? Ans: Million Cubic feet Per day MMCF stands for? Ans: Million Cubic feet SNGPL Stands for? Ans: Sui Northern Gas Pipe line limited SNGPL   was incorporated as Private limited company in ______? Guess a) 1961 b) 1962 c) 1963 d) 1964 SNGPL was converted to public limited company in _____? Guess a) 1962 b) 1963 c) 1964 d) 1965 SNGPL is listed on which stock exchange of Pakistan? Guess a) Islamabad Stock Exchange b) Lahore Stock exchange c) Pakistan Stock Exchange d) Karachi Stock Exchange Dhulian-Rawalpindi-Wah System (82 miles of 6 inch diameter pipeline) was previously run by which company? Guess a) Total Parco b) Shell c) Attock oil company limited d) Non of these PIDC   Stands for? Ans: Pakistan Industrial Development Corporation Sui- Multan System of PIDC   ( 217 miles of 16 inch and 80 miles of 10 inch diameter pipeline) was taken over by which company? guess a) AOL b) MOL c) SNGPL d) Byco At the start of SNGPL it se